![]() It also has been designated an official Virginia truck route without height or weight restrictions. The fixed, high-rise bridge is one of the tallest in Virginia and not subject to openings for maritime traffic. With quick connections to I-464 and I-264, it’s an alternative route when neighboring bridges and tunnels are congested. This private toll bridge opened in October 2012 and spans the Southern Branch of the Elizabeth River. The bridge can open upon request during the restricted hours for a vessel with a draft of at least 18 feet if at least six hours of notification has been given. and from 3 to 7 p.m., Monday through Friday, except during federal holidays. The bridge will remain in the close position during commute periods, from 5 to 9 a.m. The duration of the traffic stops due to the bridge lifts are dependent on maritime traffic volumes. The bridge will not open during these scheduled times when vessels have not signaled and are not waiting for passage. The I-264 Berkley Bridge will open for maritime vessel signal at 9 a.m., 11 a.m., 1 p.m., and 2:30 p.m., Monday through Friday. The bridge merges I-464 traffic traveling from Chesapeake with I-264 traffic in Norfolk.Įach of the four leafs on the dual drawbridge weighs 640 tons. The bridge was rebuilt in 1991 to handle increased traffic. The Berkley Bridge opened in 1952 and is part of the I-264 Downtown Tunnel complex, connecting Portsmouth and Norfolk.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |